Preventive maintenance is work done on a schedule, by calendar or run hours, to catch wear before it becomes a breakdown. For any production machine that means a daily walk and guard check, weekly motor readings, monthly lubrication and belts, quarterly oil and vibration samples, and an annual infrared scan of the electrical panels. Fill in the checklist below, then download it as a PDF (filled or blank) or an Excel file. For one machine type, use the equipment checklists further down. Morsa asks for the checklist on its dates.
Updated November 12, 2026
Preventive maintenance schedule at a glance
| How often | What to check | Why |
|---|---|---|
| Daily | Visual walk, guards, leaks, gauges, housekeeping | Catches what changed since yesterday |
| Weekly | Motor temperature or vibration against baseline | Heat and vibration rise before a bearing fails |
| Monthly | Lubrication, belts, guards, mountings, terminals, filters, stops | The wear items that change between visits |
| Quarterly | Oil samples, vibration trend, review of repeat failures | Shows condition, and whether the intervals are right |
| Annual | Infrared scan of electrical panels, voltage balance, lockout review | The electrical and safety items |
Frequencies follow the sample checklists in the US DOE O&M Best Practices Guide, which has daily, weekly, monthly and annual columns. The quarterly row is our grouping of the guide’s oil and vibration analysis.
What preventive maintenance is, and what it saves
The US DOE’s O&M Best Practices Guide defines preventive maintenance as “actions performed on a time- or machine-run-based schedule that detect, preclude, or mitigate degradation of a component or system”. It cites studies saying the approach can save 12% to 18% on average against running equipment until it fails, and notes the guide’s own caveat: it is labor intensive and can include maintenance that was not needed. Predictive maintenance, which acts on measured condition, is the next step.
How to build a preventive maintenance checklist for any asset
List the assets and rank them by what a stoppage costs: how many people or orders wait when it stops, and how long a repair takes. Start with the machines that stop the line.
Pull the manufacturer’s manual for each. The intervals in it beat any generic list, including this one.
Set the frequency by run hours where wear follows use, and by calendar where it follows time. Use whichever comes first.
Assign each task to a named person or role, with the time it takes and the part or tool needed.
Log every completion with the date, the reading and what was found, and review repeat failures so the intervals can change.
Starting from nothing? This is our suggestion, not a standard: in the first month, take the 10 to 20 machines that stop the line, copy their manuals’ intervals into this list, and run it. Then watch one number, the share of scheduled PMs done on time. Toyota Material Handling tells customers to ask for the same figure, the PM completion rate, from their service provider.
Checklists by equipment
Forklift maintenance checklist: service by hour meter, 250 to 2,000 hours, electric and engine
Air compressor maintenance checklist: drains, filters, separator, oil and safety valve
CNC machine maintenance checklist: way lube, coolant, chips and spindle
Conveyor maintenance checklist: belts, rollers, drives and guards
Boiler maintenance checklist: water level, blowdown, tests and inspection
Chiller maintenance checklist: daily readings, tube cleaning and leak checks
Cooling tower maintenance checklist: water treatment, drift eliminators and Legionella
Commercial HVAC maintenance checklist: filters, coils, belts and refrigerant
Generator maintenance checklist: weekly inspection, monthly run and annual load test
UPS maintenance checklist: batteries, bypass and firmware
Plant shutdown checklist: six phases from planning to restart
Electrical preventive maintenance checklist
Loose or hot electrical connections are a fire and outage risk, so the list scans them every year. FLIR’s summary of NFPA 70B (2023) says the standard now calls for inspecting all electrical equipment at least every 12 months, and equipment with an urgent finding at least every 6 months by thermography. We did not read the standard itself; the intervals here come from FLIR’s summary. The monthly and annual items above on terminals, voltage balance and infrared scans come from the DOE guide and that summary. Lock gear out before you open it, under OSHA 1910.147.
HVAC and building preventive maintenance checklists
The DOE guide has sample checklists with daily, weekly, monthly and annual columns for boilers, steam traps, chillers, cooling towers, building controls, pumps, fans, motors and air compressors. Our equipment pages above turn the main ones into fillable checklists. For the rooftop units and air handlers in an office or warehouse, start with the commercial HVAC maintenance checklist.
Preventive maintenance checklist template in Excel
Fill in the checklist above and use the Excel download, or print the blank PDF. The sheet lists every frequency, with a Done, Issue or N/A column, the reading and who did it. Load it into your CMMS or keep it in a shared drive, but keep one row per task per asset.
Preventive maintenance mistakes
One generic list for every machine. A press, a boiler and a conveyor wear differently.
Ignoring the manual. The manufacturer’s interval is the floor.
Skipping the log. An unlogged PM cannot be shown to an auditor or an insurer.
Never changing the intervals. Review repeat failures; the DOE guide notes PM can include unneeded work.
Safety checks that no one tests. A stop button that is never pressed is not a safety device.
Keeping preventive maintenance on schedule
Morsa schedules the PM checklist, logs it and flags missed checks. Each machine’s tasks go to the technician by WhatsApp, Teams, text or email when they are due. Morsa files the answers against the asset and tells the maintenance lead about a missed or failed check. If a lead approves a work order once for a kind of repair, Morsa can raise it the next time under that rule.
Frequently asked questions
What is a preventive maintenance checklist?
A list of tasks, with how often each is done, that a technician completes on a machine to catch wear early. Ours has 25 checks from daily to annual.
What should a preventive maintenance checklist include?
Visual checks, guards, lubrication, belts, fasteners, leaks, motors, electrical connections, safety devices and cleanliness, each with a frequency.
Where can I get a preventive maintenance checklist template in Excel?
Fill in the checklist on this page and download the Excel file, or print the blank PDF.
Is there an HVAC preventive maintenance checklist?
Yes: the commercial HVAC maintenance checklist covers filters, coils, belts, refrigerant and controls.
How often should preventive maintenance be done?
By the manufacturer’s manual, in run hours or calendar time, whichever comes first. The general list here runs daily to annual.
What is the difference between preventive and predictive maintenance?
Preventive acts on a schedule. Predictive acts on measured condition, such as vibration or oil analysis.
Related tools
Sources
US DOE FEMP, Operations and Maintenance Best Practices Guide, Release 3.0 (read November 12, 2026)
OSHA, 29 CFR 1910.212, General requirements for all machines, osha.gov (read November 12, 2026)
OSHA, 29 CFR 1910.219, Mechanical power-transmission apparatus, osha.gov (read November 12, 2026)
OSHA, 29 CFR 1910.147, The control of hazardous energy, osha.gov (read November 12, 2026)
OSHA, 29 CFR 1910.22, Walking-working surfaces, osha.gov (read November 12, 2026)
FLIR, NFPA 70B 2023: new guidelines for electric inspections (read November 12, 2026)
Where Morsa fits
Get every PM done and logged, not just planned.
Morsa schedules your preventive maintenance, asks each technician for the checklist, logs it and flags what is missed. It works in whatever your plant runs on: WhatsApp, Teams, email or text.