Every day, log the disinfectant residual and walk the tower. Every week, flush dead legs and test the water. Every 3 months, grease the fan bearings, flush the basin and clean the fill and drift eliminators. Change gearbox oil every 6 months or 2,500 hours. At least once a year, take the tower offline for cleaning and disinfection. These are the CDC’s Legionella controls plus the maker’s service intervals. Fill in the checklist below, then download it as a PDF (filled or blank) or an Excel file. Morsa asks for each check and flags a missed or failed one.

Updated November 12, 2026

Equipment and technician
Optional
Optional
Daily checks (5)
1.Walk the tower: water flowing, nothing clogged, nothing unusual; log it
Walk the tower: water flowing, nothing clogged, nothing unusual; log it
2.Listen for new noise or vibration from the fan, motor and gearbox
Listen for new noise or vibration from the fan, motor and gearbox
3.Read and log the disinfectant residual; oxidizing disinfectants need a measurable residual every day
Read and log the disinfectant residual; oxidizing disinfectants need a measurable residual every day
4.Confirm the automated chemical feed and blowdown are running
Confirm the automated chemical feed and blowdown are running
5.Read the basin water temperature; note any time it sits at 77 to 113 F
Read the basin water temperature; note any time it sits at 77 to 113 F
0 of 5 marked
Your own tasks (0)

Add tasks your site needs. They print with this checklist, on the full schedule and in Excel. 0 on this checklist, 0 of 15 used across the cooling tower checklists.

Before you file it: 3 to fix
  • FixAdd the tower number, so the check is filed against the right tower.
  • FixAdd the technician's name.
  • FixAdd the date.
  • Check5 of 5 checks are not marked yet.
Show
Cooling tower maintenance checklistDaily checksMechanical-draft open tower. Water limits and oil intervals are one maker's; use your manual and water treater.Tower numberLocationFan run hoursDateTechnicianCompany or siteReviewed byMark each check Done, Issue or N/A; a check with no N/A box applies to every unit. Write what is wrong against each issue and open a work order. Sourcenumbers refer to the list at the end.#Daily checksSourceDoneIssueN/AReading or note1Walk the tower: water flowing, nothing clogged, nothing unusual; log it42Listen for new noise or vibration from the fan, motor and gearbox33Read and log the disinfectant residual; oxidizing disinfectants need ameasurable residual every day14Confirm the automated chemical feed and blowdown are running15Read the basin water temperature; note any time it sits at 77 to 113 F1Technician signatureWork orders openedReviewed by (maintenance lead)DateBased on:1. CDC, Controlling Legionella in Cooling Towers, Legionella Control Toolkit (read 12 November 2026)2. Baltimore Aircoil Company, Series 3000 Operation and Maintenance Manual, rev. 6.0, 2023 (read 12 November 2026)3. SPX Cooling Technologies, Marley NC maintenance schedule (read 12 November 2026)4. US DOE FEMP, O&M Best Practices Guide, Release 3.0, section 7.5.9 Cooling towers checklist (read 12 November 2026)5. CDC, Routine Testing for Legionella, Legionella Control Toolkit (read 12 November 2026)Cooling tower maintenance checklist: Daily checks.

Next, Morsa schedules this checklist, asks the technician for it from their phone, logs the result against the asset and flags any check that is missed or fails. Compare predictive maintenance software or book a demo.

Blank cooling tower forms to print:

1 page, letter size. 0 of 5 checks marked.

Runs in your browser. Nothing you type is uploaded; the check is saved only in this browser, and the PDF and Excel files are built on your device.

Cooling tower maintenance schedule at a glance

How oftenWhat to checkWhy
DailyVisual walk, disinfectant residual, chemical feed, water temperatureCDC: oxidizing disinfectants need a measurable residual every day
WeeklyFlush dead legs, water chemistry, strainer, make-up valve, motor readingCDC says flush at least weekly; DOE lists weekly water tests
MonthlyAir inlet, nozzles, basin, drift eliminators, gearbox oil level and leaks, beltsSPX Marley’s monthly column
Every 3 monthsFan bearings, basin flush, fill and eliminators, belt tensionBAC sets these quarterly
Every 6 months or 2,500 hoursGearbox oil change (first change at 500 hours or 4 weeks)BAC
YearlyOffline cleaning and disinfection, fan pitch, finishCDC: at least annually

Intervals are from CDC, the Baltimore Aircoil Series 3000 manual, the SPX Marley NC schedule and the US DOE guide. Your tower’s manual overrides them.

How to use the cooling tower maintenance checklist

  1. Enter the tower number and the fan run hours.

  2. Work down the checklist that is due. Mark each check Done, Issue or N/A. Water and drift checks cannot be marked N/A.

  3. Write what is wrong against any failed check, with the reading and who was told.

  4. Download the PDF (filled or blank) for the roof, or the Excel file for the water log.

Cooling tower water treatment: the limits

Most checklists say to test the water. This table gives limits for the circulating water from Baltimore Aircoil’s Series 3000 manual. The right numbers for your tower depend on the make-up water and the metal in the system, so your water treater sets yours.

PropertyGalvanized steelType 304 stainless
pH6.5 to 9.06.5 to 9.2
Total dissolved solids1,500 ppm2,050 ppm
Conductivity2,400 micromhos/cm3,300 micromhos/cm
Alkalinity as CaCO3500 ppm600 ppm
Chlorides250 ppm300 ppm

BAC Series 3000 manual, Table 8, Quality guidelines for circulating water. Chemically treated water; bleed alone may need more conservative limits. ppm is parts per million.

Legionella: what the CDC says to do

  • Know the four factors. Sediment and biofilm, temperature, water age and disinfectant residual drive Legionella growth. Run the water below the 77 to 113 F growth range where you can.

  • Flush dead legs weekly and keep a measurable disinfectant residual every day.

  • Clean offline at least annually, and before startup, when idling and after shutdown.

  • Run a water management program. CDC calls these programs an industry standard for large buildings under ASHRAE 188 and says a building with a cooling tower should have one for it. We did not read ASHRAE 188 or Guideline 12 themselves; the controls here come from the CDC toolkit that implements them.

  • Follow your state and local rules, which CDC says take precedence where they differ.

What a Legionella test result means

CDC sets no testing interval; your water management program does. For results it gives performance indicators: under 10 CFU/mL (colony forming units per milliliter) in a cooling tower means growth looks well controlled. At or above 10 CFU/mL, conditions may allow growth. A 10- to 100-fold increase means poorly controlled growth, and more than 100-fold means uncontrolled growth. CDC says the presence of any Legionella should trigger response activities: check the sample, the equipment and the records, re-evaluate the program, treat only after that, and re-test at least 48 hours after the system returns to normal. A result alone does not measure health risk.

Drift eliminators, fill, fans and gearbox

CDC recommends high-efficiency drift eliminators and keeping the tower at least 25 feet from outside air intakes. BAC says to inspect and clean the fill and its integral eliminators at least quarterly, drain and flush the basin quarterly, grease the fan shaft bearings every 3 months or 2,000 hours, and change gearbox oil every 2,500 hours or 6 months (first change at 500 hours or 4 weeks). It also says to limit the fan motor to six on-off cycles an hour.

Where the cooling tower sources disagree

SPX Marley lists belt tension monthly, BAC at least every 3 months. A trade article says test the water monthly; the DOE guide lists weekly water samples. One checklist puts Legionella testing quarterly, but CDC gives no interval and ties it to your program. We used the shorter interval where manufacturers or DOE differ, and left the Legionella interval to your water management program.

What to do when a cooling tower check fails

  • Lock out before service. BAC’s manual warns that fans, motors and drives must be disconnected, locked out and tagged out before anyone works near them. OSHA 29 CFR 1910.147 requires isolation and verification.

  • Residual low or water out of limits: follow the response in your water management program and call your water treater.

  • Heavy vibration or a noisy gearbox: stop the fan and inspect before restarting.

  • Suspected illness: the public health authority decides if there is an outbreak. CDC’s offline emergency steps include holding at least 20 ppm, then 10 ppm for 24 hours, of free oxidant. Use a water treatment professional.

Cooling tower maintenance mistakes

  1. Treating the tower as a mechanical item only. Water is half the job.

  2. No written log. CDC says to keep log sheets, test procedures and results on site.

  3. Leaving a tower idle and wet. CDC says to circulate 3 times a week in short standby.

  4. Skipping the annual offline clean.

  5. Letting sludge build in the basin. BAC flushes quarterly.

Keeping the cooling tower checklist on schedule

Morsa sends the daily round to the operator or the water treatment vendor in WhatsApp, Teams, text or email, logs the residual and pH against the tower and keeps the weekly flush and water test dated. If a daily residual reading is missing or out of range, Morsa tells the maintenance lead the same day. Quarterly tasks come due by date or 2,000 fan hours, whichever is first; the lead approves the schedule.

Other maintenance checklists

Frequently asked questions

How often should a cooling tower be maintained?

Daily and weekly water and visual checks, monthly and quarterly mechanical items, and an offline cleaning and disinfection at least yearly, per CDC.

What is on a cooling tower maintenance checklist?

Water treatment and Legionella controls, drift eliminators, fill, basin, fans, gearbox, motor and belts, with a frequency for each.

How often should cooling tower water be tested?

The DOE guide lists weekly samples for solids and chemistry, and CDC says disinfectant residual should be measurable every day.

How often should a cooling tower be cleaned?

BAC says to flush the basin and clean the fill quarterly. CDC says at least one offline cleaning and disinfection a year.

Does a cooling tower need a Legionella water management program?

CDC says a building with a cooling tower should have a program for it, and calls programs an industry standard under ASHRAE 188. Check your state and local rules.

How often should cooling tower gearbox oil be changed?

BAC: after 500 hours or 4 weeks, then every 2,500 hours or 6 months, whichever comes first. Use your manual.

Where Morsa fits

Keep the tower, and its water log, up to date.

Morsa asks for the daily round, logs the readings and flags a missing or out-of-range check. It works in whatever your plant runs on: WhatsApp, Teams, email or text.

Machines, people, and vendors, finally in one. We start with yours.

For queries, feedback or suggestions

© 2026 Morsa. All Rights Reserved. A Product by Lunar.

Machines, people, and vendors, finally in one. We start with yours.

For queries, feedback or suggestions

© 2026 Morsa. All Rights Reserved. A Product by Lunar.

Machines, people, and vendors, finally in one. We start with yours.

For queries, feedback or suggestions

© 2026 Morsa. All Rights Reserved. A Product by Lunar.