A work order is the written instruction that assigns a job to a person: what to do, on which machine or part, by when, and a record of what was done. Pick a maintenance or a production work order, fill in the fields and watch the preview update, then download it as a PDF, Word or Excel file or print it. A blank work order form to fill in by hand is under the downloads. Open work orders usually get chased by someone walking the floor; Morsa, an AI agent for plant operations, follows each one until it is closed.

Updated November 3, 2026

Work order type
Your company
Optional
Work order
Optional
Priority
Machine and problem
Optional
Optional
Type of work
What happened, any alarm code, what was already tried
Notes and safety instructions
Optional
Tasks (1)
Task 1
Parts and materials used (1)
Part 1
Completion

Leave these blank to print the work order for the technician; they fill them in by hand.

Optional
Before you send it: 3 to fix
  • FixName the machine or asset, so the technician goes to the right one.
  • FixDescribe the problem or the work: what happened, any alarm code, what was already tried.
  • FixAssign it to a person or a team. A work order without an owner waits.
  • CheckGive it a work order number so people can refer to it.
NormalPriorityMaintenance work orderRequestRequested by-Assigned to-Machine or asset-Asset ID-Location-Type of workRepair (corrective)Lockout/tagout required before work startsProblem or work requestedTasksNone listedCompletionCause foundWork doneCompleted byDate completedAccepted byTechnician signatureAccepted by (requester or supervisor)Maintenance work order

Next, Morsa opens the work order from the operator’s text or the machine’s fault, assigns it and chases it until the technician closes it. Compare it with a CMMS or book a demo.

Blank maintenance form to fill in by hand (two pages):

1 page, letter size.

Runs in your browser. Nothing you type is uploaded; the work order is saved only in this browser, and the PDF, Word and Excel files are built on your device.

What is a work order?

A work order is a document that authorizes and tracks one piece of work. In maintenance it sends a technician to a machine: the problem, the priority, the safety steps, the tasks, the parts and the time spent. In production it releases a quantity of a part to the floor: the part number and revision, the quantity, the operations and work centers, the materials and the quantity good at the end. Both kinds answer the same questions: what, where, who, by when, and was it done.

The work order is also the record. Once it is closed it shows what failed, what fixed it and what it cost, which is the history you need when the same machine stops again or a customer asks how a batch was made.

What to include on a maintenance work order

These are the fields the maintenance preset above prints, in the order a technician reads them.

FieldWhy it mattersExample
Work order numberHow people refer to the jobWO-24-0412
Date created, due date and prioritySets the order the work gets done inHigh, due tonight
Requested by and assigned toOne owner, so the job does not waitRosa requested; Priya assigned
Machine or asset, asset ID, locationSends the technician to the right machineLathe 6, LTH-06, Cell 2
Type of workSeparates repairs from planned work in your historyRepair, preventive, inspection, emergency
Problem or work requestedWhat happened, any alarm code, what was triedAlarm 1023 bar feeder fault, cleared twice
Machine down, and since whenPuts the downtime on recordDown since 11:20 PM
Lockout/tagout requiredA reminder to isolate energy before work startsTicked
Tasks with done by and hoursThe steps, who did each and the labor timeClear chips from the push rod, 0.5 h
Parts used with quantity and unit costThe cost of the repair and what to restockPush rod tip, 1 at 48.00
Cause found, work done, follow-upTurns one repair into history you can learn fromChips wrapping; order MR inserts
Completed by, date, accepted by, signaturesCloses the job with a name on itPriya; accepted by Rosa

Need a failure code, estimated hours or a permit (hot work, confined space)? Add them in the notes; they print under Notes and safety instructions.

What to include on a production work order

A production work order, also called a job order or manufacturing order, releases a quantity of one part to the floor. Pick Production above for these fields.

FieldWhy it mattersExample
Part number and revisionThe floor builds to one drawing versionCVB-200 Rev C
Quantity and unitHow many to make250 EA
Customer and sales orderTies the job to the order it ships againstStock order, SO-30915
Drawing and materialWhat to make it from316 stainless bar, 2.0 in
Operations with work center, setup and run hoursThe routing, in order, with the planned timeOp 10, Lathe 6, 1.0 h setup, 6.25 h run
Materials issued with lot or heatTraceability if a part fails laterHeat 7Q4410
Quantity good and scrappedCloses the job against what was ordered248 good, 2 scrapped
Completed by, verified by, signaturesWho made it and who checked itDan; verified by quality

Types of maintenance work orders

TypeWhen it is raisedExample
Repair (corrective)Something failed or is about toBar feeder fault, leaking cylinder
PreventiveOn a schedule, by date or by machine hoursMonthly lubrication, filter change every 500 h
InspectionA check that may lead to a repairWeekly guard and E-stop check
EmergencyA safety risk or a stopped line that cannot waitHydraulic hose burst on the press

Keep the type on every work order. After a few months the split between repair and preventive work tells you whether maintenance is getting ahead of breakdowns.

How to fill out a work order

  1. Pick the type. Maintenance for a machine, production for a part.

  2. Write the problem in the requester’s words. Include the alarm code, the time and what was already tried. “Chips wrapped on bar feeder again, cleared x2” beats “feeder broken”.

  3. Set the priority and the due date, and assign one person or team. A work order without an owner tends to sit.

  4. List the tasks or operations in order. Paste a list from your notes or from Excel; each line becomes a row.

  5. Add the parts or materials with quantity, and the unit cost if you track repair cost.

  6. Print it or send it. Leave the completion part blank on a printed copy; the technician fills it in.

  7. Close it. Cause found, work done, hours, quantity good, signatures. Keep the closed copy with the machine’s history.

Work order example

The maintenance example in the tool comes from a sample machine shop: Lathe 6 stopped overnight on alarm 1023, a bar feeder fault, with chips wrapped around the push rod. It was cleared twice and then down 40 minutes, the third stop that week. The work order goes to Priya, the maintenance lead, at high priority for tonight, with lockout ticked, five tasks from lockout to a ten-bar test run, the push rod tip on the parts list and a follow-up to order chip breaker inserts. The production example releases 250 CVB-200 check valve bodies at Rev C through saw, lathe, deburr and inspection. Press “Start from this example” to load either one and change it into your own.

Paper, spreadsheet, CMMS or Morsa

A paper or spreadsheet work order is free and works for a few machines. It breaks down on follow-through: the form is filled in, then someone has to notice it is still open, ask the technician, find the part and tell the requester. A CMMS keeps every work order in one place, but someone still types each request in, and most are priced per user, so operators often have no login (CMMS pricing compared).

Morsa can take over the follow-through. An operator texts “Lathe 6 down again, alarm 1023” in WhatsApp or Teams, or the machine reports the fault; Morsa opens the work order with the machine, the alarm and the times, assigns it to the right technician and asks for the parts. It checks in until the job is closed, records the cause and the work done, and tells the requester the machine is back. People approve; Morsa does the chasing. At J4S, a 120-person glass plant, the same follow-through on operational commitments (the tasks people had promised) took on-time completion from about 30% to about 75% across roughly 900 commitments in four weeks.

Mistakes that keep work orders open

  1. No single owner. “Maintenance” is not a person. Assign a name.

  2. A vague problem. “Machine not working” sends the technician to find out what the operator already knew.

  3. No priority or due date, so everything looks urgent and the technician has to guess the order.

  4. Completion left blank. Without the cause and the work done, the next breakdown starts from zero.

  5. Parts not recorded. The spare is gone from the shelf and nobody reorders it.

  6. Closed without the requester knowing, so the operator keeps reporting a machine that was fixed.

Frequently asked questions

What is a work order form?

It is the sheet, paper or digital, that turns a request into assigned work: what has to be done, on which machine or part, by whom, by when, and a place to record what was done, the parts used and the time spent. This template is that form, filled in on screen and printed or downloaded.

What is the difference between a work request and a work order?

Anyone can raise a work request: an operator reports a noise, a leak or an alarm. A work order is the request after someone accepted it, gave it a priority and assigned it to a technician. Many plants keep one form and mark it requested, then assigned.

What is the difference between a work order and a purchase order?

A work order tells your own people to do work. A purchase order tells a supplier to deliver goods or services at an agreed price. A repair can need both: the work order for your technician and a purchase order for the spare part.

Who fills out a work order?

The requester fills in the problem, the machine and when it happened. The planner or maintenance lead sets the priority, the type of work and the assignee. The technician fills in the tasks done, the parts used, the hours, the cause found and signs it off. The requester or a supervisor accepts the work at the end.

How should work orders be numbered?

Use one running sequence per site that never repeats, often with the year, such as WO-24-0412. The number is how people refer to the job in a chat or at the shift meeting, so print it large at the top. The New work order button above moves the number up by one.

Does a work order need lockout/tagout?

OSHA 1910.147 covers servicing and maintenance where unexpected start-up or stored energy could injure workers, with limited exceptions, such as cord-and-plug equipment that is unplugged and under the sole control of the person servicing it. The standard asks for written energy control procedures and for affected employees to be told before the lockout and after it ends. Ticking the lockout box on the work order is a reminder to follow that procedure; it does not replace it.

Is there a work order template in Excel?

Yes. The Excel download keeps hours, quantities and unit costs as numbers with line totals and sums, so you can add rows or copy the totals into a log. The blank form also comes as Excel.

WHERE MORSA FITS

Stop walking the floor to chase open work orders.

Morsa opens work orders from the operator’s message or the machine’s fault, assigns them and follows each one until it is closed. It works in WhatsApp, Teams, email or whatever your plant already runs on, next to your ERP.

Machines, people, and vendors, finally in one. We start with yours.

For queries, feedback or suggestions

© 2026 Lunar Inc. All Rights Reserved.

Machines, people, and vendors, finally in one. We start with yours.

For queries, feedback or suggestions

© 2026 Lunar Inc. All Rights Reserved.

Machines, people, and vendors, finally in one. We start with yours.

For queries, feedback or suggestions

© 2026 Lunar Inc. All Rights Reserved.