Free tool

Boiler maintenance checklist

On a commercial or industrial steam boiler, check the water level and blow down the water column every day, blow down the boiler at least once every 8 hours, test the low water cutoff monthly, and check the safety valves and waterside surfaces every year. Your insurer and local law also require periodic inspection by an authorized inspector; ask yours how often. Fill in the checklist below, then download it as a PDF (filled or blank) or an Excel file. Morsa asks for the log and flags a missed or failed check.

Updated November 12, 2026

Equipment and technician
Optional
Optional
Daily checks (9)
1.Check the water level in the gauge glass; always be sure of the level
Check the water level in the gauge glass; always be sure of the level
2.Steam boilers: blow down the water column
Steam boilers: blow down the water column
3.Steam boilers: blow down the boiler at least once every 8 hours, or as your water treater sets
Steam boilers: blow down the boiler at least once every 8 hours, or as your water treater sets
4.Check combustion visually: flame shape and color
Check combustion visually: flame shape and color
5.Log feedwater pressure and temperature, flue gas temperature, fuel pressures, steam pressure, make-up water
Log feedwater pressure and temperature, flue gas temperature, fuel pressures, steam pressure, make-up water
6.Treat the water by the program and confirm the treatment system is working
Treat the water by the program and confirm the treatment system is working
7.Look for an unstable water level, pressure swings and unusual noise
Look for an unstable water level, pressure swings and unusual noise
8.Check boiler room air temperature and that combustion air openings are clear
Check boiler room air temperature and that combustion air openings are clear
9.Oil-fired: clean oil filters and strainers; confirm oil is at the right temperature
Oil-fired: clean oil filters and strainers; confirm oil is at the right temperature
0 of 9 marked
Your own tasks (0)

Add tasks your site needs. They print with this checklist, on the full schedule and in Excel. 0 on this checklist, 0 of 15 used across the boiler checklists.

Before you file it: 3 to fix
  • FixAdd the boiler number, so the check is filed against the right boiler.
  • FixAdd the technician's name.
  • FixAdd the date.
  • Check9 of 9 checks are not marked yet.
Show
Boiler maintenance checklistDaily checksCommercial and industrial steam and hot water boilers. Mark steam, hot water, oil or gas items N/A as needed.Boiler numberLocationBurner hoursDateTechnicianCompany or siteReviewed byMark each check Done, Issue or N/A; a check with no N/A box applies to every unit. Write what is wrong against each issue and open a work order. Sourcenumbers refer to the list at the end.#Daily checksSourceDoneIssueN/AReading or note1Check the water level in the gauge glass; always be sure of the level12Steam boilers: blow down the water column13Steam boilers: blow down the boiler at least once every 8 hours, or asyour water treater sets14Check combustion visually: flame shape and color15Log feedwater pressure and temperature, flue gas temperature, fuelpressures, steam pressure, make-up water16Treat the water by the program and confirm the treatment system isworking17Look for an unstable water level, pressure swings and unusual noise38Check boiler room air temperature and that combustion air openingsare clear39Oil-fired: clean oil filters and strainers; confirm oil is at the righttemperature3Technician signatureWork orders openedReviewed by (maintenance lead)DateBased on:1. Cleaver-Brooks, CBEX Elite 1300-2200 Operation and Maintenance Guide, inspection schedule (read 12 November 2026)2. Cleaver-Brooks, CBEX-DE manual, recommended boiler inspection schedule and periodic inspection (read 12 November 2026)3. US DOE FEMP, O&M Best Practices Guide, Release 3.0, section 7.2.9 Boilers checklist (read 12 November 2026)4. EPA, Small entity compliance guide for area source boilers, 40 CFR 63 subpart JJJJJJ (read 12 November 2026)5. US DOE FEMP, O&M Best Practices Guide, Release 3.0, section 7.3.8 Steam traps checklist (read 12 November 2026)Boiler maintenance checklist: Daily checks.

Next, Morsa schedules this checklist, asks the technician for it from their phone, logs the result against the asset and flags any check that is missed or fails. Work out what downtime costs or book a demo.

Blank boiler forms to print:

1 page, letter size. 0 of 9 checks marked.

Runs in your browser. Nothing you type is uploaded; the check is saved only in this browser, and the PDF and Excel files are built on your device.

Commercial boiler maintenance schedule at a glance

How oftenWhat to checkSource
DailyWater level, water column and boiler blowdown, combustion, log readings, water treatmentCleaver-Brooks
WeeklyFuel valves, alarms, limit and safety controls, flue gas, relief valvesCleaver-Brooks, DOE
MonthlyBurner, low water cutoff test, flame failure test, combustion analysisCleaver-Brooks, DOE
Every 6 monthsClean low water cutoffs, refractory, oil pump strainer and preheaterCleaver-Brooks
YearlyFireside and waterside surfaces, safety valvesCleaver-Brooks
As insurer and law requirePeriodic pressure vessel inspection by an authorized inspector; ask how oftenCleaver-Brooks

This is the Cleaver-Brooks schedule for its firetube boilers plus the US DOE guide. The manual for your boiler and your jurisdiction’s rules come first.

How to use the boiler maintenance checklist

  1. Enter the boiler number and the burner hours.

  2. Pick the checklist that is due and mark each check Done, Issue or N/A. Steam, hot water, oil and gas items are N/A when they do not apply. Water level, low water cutoff, flame and safety checks cannot be marked N/A.

  3. Write the readings and what is wrong against failed items.

  4. Download the PDF (filled or blank) for the boiler room, or the Excel file for the log.

Steam boiler water level, blowdown and low water cutoff

Cleaver-Brooks says most major boiler damage comes from low water or untreated water, so be sure of the water level and blow down the water column daily. It recommends blowing down a steam boiler at least once in every eight-hour period, with the frequency set by water quality, and prefers frequent short blows to rare long ones. For the low water cutoff on a steam boiler, check operation by stopping the water flow and letting the level fall; if the control does not cut off the burner at the proper level, repair or replace it at once. Do not adjust the cutoff point.

Hot water boilers cannot have their cutoffs blown down because the whole system is flooded. Cleaver-Brooks says to remove the operating mechanism at least annually and clean the float, moving parts and the bowl. A water meter on the make-up line shows losses.

Boiler combustion checks and tune-ups

The DOE guide lists flue gas composition weekly, with natural gas at 1.5% oxygen and 10% carbon dioxide, No. 2 oil at 2.0% and 11.5%, and No. 6 oil at 2.5% and 12.5%. These vary with the fuel, and your burner maker’s targets win. Cleaver-Brooks adds a combustion analysis monthly.

EPA’s area source boiler rule (40 CFR 63 subpart JJJJJJ) requires tune-ups every 2 years for coal-fired boilers under 10 MMBtu/hr, biomass boilers and oil-fired boilers over 5 MMBtu/hr, and every 5 years for seasonal, limited-use, small oil-fired and oxygen-trim boilers. Gas-fired boilers are not covered by that rule, but the maker’s schedule, your insurer, your state’s boiler rules and any inspector still apply; we did not read state rules. The tune-up includes measuring CO and oxygen before and after adjustments. Larger industrial sites may fall under other rules. Check with your environmental lead.

Pressure vessel inspection and safety valves

Cleaver-Brooks says insurance regulations and local laws require periodic inspection of the pressure vessel by an authorized inspector, usually scheduled in an off season, and the yearly safety valve check, fireside and waterside cleaning and inspection happen in the same window. It gives no interval for the inspection, so ask your inspector and insurer. We did not read ASME CSD-1 (controls and safety devices for automatically fired boilers) or the National Board Inspection Code themselves.

Boilers in food plants: steam that touches food

Where steam contacts food, 21 CFR 173.310(a) says boiler water additives may be used only if the amount is not in excess of that required for its functional purpose, and the compounds are made from the substances the section lists. Check your water treater’s products against it. We did not read other food-contact rules.

Where the boiler sources disagree

Cleaver-Brooks lists weekly and monthly control checks; the DOE guide has the low water cutoff test monthly. Cleaver-Brooks’s own steam boiler text says to test cutoffs frequently and blow down the water controls daily, so many plants test more often than monthly. The checklist uses the monthly cutoff test because it is the only interval either source states; the daily water column blowdown covers the gap, and your inspector or insurer may require more. Fireside cleaning is yearly in both. Your manual wins.

What to do when a boiler check fails

  • Low water cutoff or flame failure test fails: take the boiler out of service. Do not run it.

  • Isolate before work. OSHA 29 CFR 1910.147 requires isolation and verification before servicing. Fuel and electrical isolation both count.

  • Safety valve leaks or will not lift: recondition or replace; do not gag it.

  • Write the fault and reading on the checklist, tell the maintenance lead and open a work order. See the work order template.

Boiler maintenance mistakes

  1. Adjusting the low water cutoff. Cleaver-Brooks says not to.

  2. Skipping daily blowdowns. Sludge builds and the level control sticks.

  3. No log. The log is how combustion drift and water losses show up.

  4. Treating gas-fired as exempt from everything. The EPA rule skips gas, but your inspector does not.

  5. Delaying the pressure vessel inspection. Insurers and local law require it.

Keeping the boiler log on schedule

Morsa asks the operator for the daily log readings and the water level and blowdown confirmations by phone, in WhatsApp, Teams, text or email, and files them against the boiler. It flags a missed blowdown, a monthly cutoff test that is overdue or a reading that drifts, and reminds the lead to book the inspector before the date lapses.

Other maintenance checklists

Frequently asked questions

What should be on a boiler maintenance checklist?

Water level and blowdown, combustion, controls and safety devices, the low water cutoff and flame failure tests, safety valves, and the annual inspection.

How often should a commercial boiler be serviced?

Daily and weekly checks by operators, monthly tests, a 6-month and a yearly service, and a pressure vessel inspection as your jurisdiction requires.

How often should a steam boiler be blown down?

Cleaver-Brooks recommends at least once in every eight-hour period, with the water column blown down daily. Your water treater sets the frequency.

How often should a low water cutoff be tested?

Cleaver-Brooks says to check frequently and blow down the water controls on a steam boiler daily. The DOE guide lists a monthly test.

What is steam boiler maintenance?

Daily water level, blowdown and logs; weekly control checks; monthly tests; yearly cleaning, inspection and safety valve checks.

Does a boiler need a tune-up by law?

EPA’s area source rule requires 2 or 5-year tune-ups for some coal, biomass and oil boilers. Gas-fired boilers are not covered by it.

Where Morsa fits

Keep every blowdown, test and inspection on the calendar.

Morsa asks for the daily log, files it against the boiler and flags a missed test or a drifting reading. It works in whatever your plant runs on: WhatsApp, Teams, email or text.

Machines, people, and vendors, finally in one. We start with yours.

For queries, feedback or suggestions

© 2026 Morsa. All Rights Reserved. A Product by Lunar.

Machines, people, and vendors, finally in one. We start with yours.

For queries, feedback or suggestions

© 2026 Morsa. All Rights Reserved. A Product by Lunar.

Machines, people, and vendors, finally in one. We start with yours.

For queries, feedback or suggestions

© 2026 Morsa. All Rights Reserved. A Product by Lunar.