CNC machine maintenance checklist
Every shift, warm up the spindle, check coolant level and concentration, test the door interlock and clear chips. Mill and lathe items are labeled; mark the other kind N/A. Each week, log the concentration and check the tool changer. Each month, check the way lube and spindle lube levels. Every 6 months, run the lube tests and replace the coolant. Fill in the checklist below, then download it as a PDF (filled or blank) or an Excel file. It follows Haas Automation’s own schedules for mills and lathes. Morsa asks the machinist for each check and flags a missed one.
Updated November 12, 2026
CNC maintenance schedule at a glance
| How often | What to check | Why |
|---|---|---|
| Every shift | Spindle warm-up, coolant level and concentration, door interlock, chips off the way covers | Haas lists these weekly at minimum; its lathe checklist adds a morning check |
| Weekly | Concentration log, air pressure, tramp oil, tool changer chips, chuck and bar feeder grease | Haas’s minimum interval for coolant level and concentration |
| Monthly | Axis lube and spindle lube levels, ballscrews, way covers, cabinet vents, gearbox oil | A dry way or spindle is an expensive repair |
| 3 to 6 months | Lube tests, full coolant change, hoses, tool changer, probe calibration | Haas sets the coolant tank clean-out at 6 months |
| Annual | Gearbox oil, drawbar force, cams, hydraulic filter, ballbar test | Wear items and accuracy |
Intervals are from Haas Automation’s VMC and lathe maintenance schedules. Your machine’s manual overrides them.
How to use the CNC machine maintenance checklist
Enter the machine number and the spindle hours from the control.
Pick the checklist for the interval that is due. Mark each check Done, Issue or N/A. Mill, lathe and option items are N/A when the machine does not have them.
Write what is wrong against any failed check, with the reading.
Download the PDF (filled or blank) for the machine, or the Excel file for the maintenance log.
CNC coolant: concentration and tank changes
Bad coolant rusts the machine, and Haas says that damage is not covered by warranty. Haas says to check the concentration with a refractometer against the coolant maker’s specification. Its mill manual warns that a lean mix “may not effectively prevent machine components from rusting”, a rich mix “wastes coolant concentrate”, and plain water causes rust. Haas’s schedules put the level and concentration checks weekly, its lathe checklist adds a morning check, and both list a full tank clean and replace every six months. We put the weekly and morning checks on the daily list; weekly is Haas’s minimum. The target percentage comes from your coolant’s data sheet, not from us.
Way lube, spindle lube and warm-up
Axis lubrication: check the reservoir monthly and refill; run the axis lubrication test every six months; grease ballscrews and linear guides with zerk fittings monthly, or weekly when cutting absorbent materials.
Spindle lubrication: check the tank monthly; run the spindle lubrication test every six months.
Warm-up: the Haas lathe checklist says to run the spindle at 500 RPM for 5 minutes before cutting.
Chips: clear the way covers each shift. Chips under the covers are what scores ways and ballscrews.
CNC backlash and ballbar checks
Backlash and positioning errors show up as scrap before they show up as alarms. A ballbar traces a circle and measures how far the machine departs from it. Renishaw’s brochure says the machine’s performance should be “checked regularly”, and that its results follow ISO 230-4 and ASME B5.54. It gives no test interval, so set yours, record the result and compare it with the last one. The checklist puts the ballbar test on the annual checklist for that reason, and you can move it earlier if you cut tight-tolerance parts.
Where the CNC maintenance sources disagree
Third-party guides say CNC preventive maintenance is “typically quarterly or semi-annually” and list concentration targets such as 5 to 10 percent that no manufacturer we read states. Haas, the manufacturer, gives the intervals above and defers the concentration to the coolant maker. We used Haas. If you run Mazak, Okuma, DMG Mori or another make, their schedule replaces ours.
What to do when a CNC check fails
Door interlock or window fails: do not run the machine. Haas checks both daily for a reason.
Lube level or test fails: stop cutting; running dry is the repair you cannot defer.
Before any repair, lock it out. OSHA 29 CFR 1910.147 requires isolating the machine, relieving stored energy and verifying isolation before servicing.
Write the fault and the reading on the checklist, tell the maintenance lead and log the stoppage on the machine downtime log.
CNC maintenance mistakes
Topping off coolant with water. Concentration drifts; test it, do not guess.
Skipping the warm-up. Haas lists it first on its lathe morning checklist.
Letting chips sit under the way covers.
No log. Haas supplies a mixture maintenance log sheet. Fill it in every week.
One schedule for every machine. A lathe has chucks and hydraulics; a mill has a tool changer and counterbalance.
Keeping the CNC checklist on schedule
Morsa sends each machinist the daily check at the start of the shift, in WhatsApp, Teams, text or email, and files the answers, including the coolant concentration reading, against the machine. It sends the weekly and monthly lists on their dates and the 6-month items when they come due, tells the maintenance lead when a lube level or interlock check fails, and lists machines with no check logged every morning.
Other maintenance checklists
Preventive maintenance checklist: the hub, a general PM checklist for any machine
Air compressor maintenance checklist: shop air, drains and filters
Conveyor maintenance checklist: belts, rollers and drives
Forklift maintenance checklist: service by hour meter
Plant shutdown checklist: phases from planning to restart
Frequently asked questions
How often should a CNC machine be maintained?
Daily checks each shift, weekly and monthly lubrication and coolant checks, and a 6-month and annual service. Haas publishes the intervals for its machines.
What is on a daily CNC maintenance checklist?
Spindle warm-up, coolant level and concentration, air pressure, door interlock and window, and clearing chips from the way covers.
What coolant concentration should a CNC machine use?
The one on your coolant maker’s data sheet. Haas says to maintain the recommended concentration and measure it with a refractometer.
How often should CNC coolant be changed?
Haas lists cleaning the tank and replacing the coolant every 6 months, with the concentration checked weekly or daily.
How often should CNC ways be lubricated?
Check the axis lube reservoir monthly and grease zerk fittings monthly, or weekly when cutting absorbent materials, per Haas.
What does a CNC maintenance checklist cover?
Coolant, lubrication, chips, tool changer, pneumatics, gearbox, hydraulics, probe, spindle and an annual accuracy test.
Related tools
Sources
Haas Automation, VMC maintenance schedule (read November 12, 2026)
Haas Automation, Lathe maintenance schedule RD0035 (read November 12, 2026)
Haas Automation, Lathe weekly maintenance checklist (read November 12, 2026)
Haas Automation, Mill operator’s manual, Next Generation Control (read November 12, 2026)
Renishaw, QC20-W wireless ballbar brochure (read November 12, 2026)
OSHA, 29 CFR 1910.147, The control of hazardous energy, osha.gov (read November 12, 2026)
Where Morsa fits
Know every machine was checked before the shift starts.
Morsa asks each machinist for the daily check, files the readings against the machine and tells maintenance about a failed check. It works in whatever your plant runs on: WhatsApp, Teams, email or text.