Operations glossary: 15 terms for plants and distributors

The operations glossary defines 15 terms that plant managers, buyers and warehouse leads use every week, grouped by planning, purchasing and suppliers, shop floor and warehouse. Each term has a one-line definition here and its own page with a formula or a worked example.

4 min

Morsa publishes this guide. Morsa is software with an AI agent that works in your ERP, email and Teams; it refreshes these numbers, and a person approves what goes out.

Read the line, then open the page if you need the formula. Every worked example uses round numbers and says whether they are sourced or our estimate.

  • Distributor, start with: lead time, MOQ, ABC analysis, pick and pack, cross docking.

  • Plant, start with: takt time, capacity planning, S&OP, andon, kitting.

Planning

  • S&OP: a monthly process in which sales, operations, supply chain and finance agree one plan that matches demand to supply, usually 12 to 18 months ahead.

  • Capacity planning: checking whether a plant can make what the plan asks, by comparing the hours demand needs with the hours each work center can deliver. Rated capacity = available hours × utilization × efficiency.

  • Takt time: the pace customer demand requires, available production time ÷ customer demand. 400 minutes and 250 units is 1.6 minutes a unit.

  • Make to order vs make to stock: make to stock builds to a forecast and ships from inventory; make to order builds only after a customer order arrives.

Purchasing and suppliers

  • MOQ (minimum order quantity): the smallest quantity, or order value, a supplier will sell you in one order, such as 500 units or $1,000.

  • Lead time: the time from placing an order to receiving it, receipt date minus order date. October 1 to October 31 is 30 days.

  • Supplier performance management: measuring every key supplier the same way, on delivery, quality, cost and responsiveness, and acting on the results.

  • Should cost analysis: estimating what a part should cost from material, labor, machine time, overhead and a fair profit, then comparing it with the supplier’s quote.

Shop floor

  • Production monitoring: capturing machine state, part counts, cycle time and stop reasons automatically and showing them live.

  • Andon: a signal that tells a team leader exactly where a problem is on the line, raised by a cord, a button or a machine sensor.

  • Gemba walk: a scheduled visit by a manager to the place where the work is done, to watch the process and ask the people doing it.

Warehouse

  • Cross docking: unloading goods from an inbound truck and loading them onto an outbound truck without storing them, typically in under 24 hours.

  • Pick and pack: taking the items on a customer order from storage and putting them in a box for the carrier.

  • Kitting: grouping the items a job, order or product needs into one kit that is stored, picked and moved as a single unit, usually built ahead of the order.

  • ABC analysis: ranking items by annual usage value into classes, usually A at about 80% of value, B at 15% and C at 5%.

Terms that get confused

Pair

The difference

Read

Lead time vs cycle time

Lead time is elapsed time from order to receipt, waiting included; cycle time is the time one unit takes at one step

Lead time

Takt time vs cycle time

Takt is the pace demand sets; cycle time is the time one unit takes at one station

Takt time

Kitting vs pick and pack

Kits are usually built ahead of the order; pick and pack boxes after it

Kitting

Cross docking vs warehousing

Goods pass through in hours, or sit in racks for days

Cross docking

Make to order vs make to stock

Build after the order, or build to a forecast

Make to order vs make to stock

Keeping these numbers current

The numbers in this glossary go stale because nobody has time to recalculate them. Morsa does:

  1. It keeps lead time and MOQ per supplier from your purchase orders, and recalculates takt, capacity and ABC class from your ERP and machine data.

  2. It shows each change and the orders it affects.

  3. A person approves each kind of change once; after that it runs under that rule.

To see it on your own numbers, book a 30-minute walkthrough.

Sources

  1. SourceDay, What Is Lead Time in Supply Chain? Definition, Formula, Examples (a software vendor): https://sourceday.com/blog/lead-time/ (read 12 November 2026)

  2. Lean Enterprise Institute, Takt Time: https://www.lean.org/lexicon-terms/takt-time/ (read 12 November 2026)

Each term page lists its own sources, all read on 12 November 2026.

Keep reading

Keep reading

Keep reading

Related pages

Glossary

Glossary

Glossary

Lead time: meaning, formula and how it sets your reorder point

Lead time is the time from placing an order to receiving it: lead time = receipt date minus order date. A purchase order placed on October 1 and received on October 31 has a 30-day lead time. The same word covers a supplier's lead time, your own production lead time, and what your customer waits.

Read the page

›

Glossary

Glossary

Glossary

Takt time: meaning, formula and how to calculate it

Takt time is the pace customer demand requires: takt time = available production time ÷ customer demand. With 400 minutes of working time a day and 250 units ordered, takt is 400 ÷ 250 = 1.6 minutes, or 96 seconds, per unit.

Read the page

›

Glossary

Glossary

Glossary

S&OP: meaning, the monthly process and a worked example

S&OP (sales and operations planning) is a monthly process in which sales, operations, supply chain and finance agree one plan that matches demand to supply, usually looking 12 to 18 months ahead. It ends with an executive meeting that signs off the plan.

Read the page

›

FAQs

FAQs

FAQs

Questions people ask

Questions people ask

Still have a question? A founder will answer.

01

What is the difference between lead time and cycle time?

Lead time includes waiting; cycle time does not [1]. See the table above.

02

What is the difference between takt time and cycle time?

Takt time is available production time divided by customer demand [2]. Cycle time is what one station takes per unit. See the table above.

03

What is the difference between kitting and assembly?

Kitting groups items and leaves them unchanged; assembly joins or configures them into a new product. See kitting.

04

What is the difference between S&OP and capacity planning?

S&OP is the monthly meeting that agrees one plan. Capacity planning checks whether the plant's hours can make that plan. See capacity planning.

05

Are the worked examples real plant data?

No. They use round numbers so you can check the arithmetic, and each page says which figures are sourced and which are our estimate.

Where Morsa fits

Where Morsa fits

Where Morsa fits

Find out where AI could make your plant more money.

Answer a few questions about your plant. We come back with a free Manufacturing AI Profitability Plan, and we tell you honestly if we are not the right fit.

Machines, people, and vendors, finally in one. We start with yours.

For queries, feedback or suggestions

© 2026 Morsa. All Rights Reserved. A Product by Lunar.

Machines, people, and vendors, finally in one. We start with yours.

For queries, feedback or suggestions

© 2026 Morsa. All Rights Reserved. A Product by Lunar.

Machines, people, and vendors, finally in one. We start with yours.

For queries, feedback or suggestions

© 2026 Morsa. All Rights Reserved. A Product by Lunar.