Morsa publishes this guide. Morsa is software with an AI agent that works in your ERP, email and Teams; it refreshes these numbers, and a person approves what goes out.
Read the line, then open the page if you need the formula. Every worked example uses round numbers and says whether they are sourced or our estimate.
Distributor, start with: lead time, MOQ, ABC analysis, pick and pack, cross docking.
Plant, start with: takt time, capacity planning, S&OP, andon, kitting.
Planning
S&OP: a monthly process in which sales, operations, supply chain and finance agree one plan that matches demand to supply, usually 12 to 18 months ahead.
Capacity planning: checking whether a plant can make what the plan asks, by comparing the hours demand needs with the hours each work center can deliver. Rated capacity = available hours × utilization × efficiency.
Takt time: the pace customer demand requires, available production time ÷ customer demand. 400 minutes and 250 units is 1.6 minutes a unit.
Make to order vs make to stock: make to stock builds to a forecast and ships from inventory; make to order builds only after a customer order arrives.
Purchasing and suppliers
MOQ (minimum order quantity): the smallest quantity, or order value, a supplier will sell you in one order, such as 500 units or $1,000.
Lead time: the time from placing an order to receiving it, receipt date minus order date. October 1 to October 31 is 30 days.
Supplier performance management: measuring every key supplier the same way, on delivery, quality, cost and responsiveness, and acting on the results.
Should cost analysis: estimating what a part should cost from material, labor, machine time, overhead and a fair profit, then comparing it with the supplier’s quote.
Shop floor
Production monitoring: capturing machine state, part counts, cycle time and stop reasons automatically and showing them live.
Andon: a signal that tells a team leader exactly where a problem is on the line, raised by a cord, a button or a machine sensor.
Gemba walk: a scheduled visit by a manager to the place where the work is done, to watch the process and ask the people doing it.
Warehouse
Cross docking: unloading goods from an inbound truck and loading them onto an outbound truck without storing them, typically in under 24 hours.
Pick and pack: taking the items on a customer order from storage and putting them in a box for the carrier.
Kitting: grouping the items a job, order or product needs into one kit that is stored, picked and moved as a single unit, usually built ahead of the order.
ABC analysis: ranking items by annual usage value into classes, usually A at about 80% of value, B at 15% and C at 5%.
Terms that get confused
Pair | The difference | Read |
|---|---|---|
Lead time vs cycle time | Lead time is elapsed time from order to receipt, waiting included; cycle time is the time one unit takes at one step | |
Takt time vs cycle time | Takt is the pace demand sets; cycle time is the time one unit takes at one station | |
Kitting vs pick and pack | Kits are usually built ahead of the order; pick and pack boxes after it | |
Cross docking vs warehousing | Goods pass through in hours, or sit in racks for days | |
Make to order vs make to stock | Build after the order, or build to a forecast |
Keeping these numbers current
The numbers in this glossary go stale because nobody has time to recalculate them. Morsa does:
It keeps lead time and MOQ per supplier from your purchase orders, and recalculates takt, capacity and ABC class from your ERP and machine data.
It shows each change and the orders it affects.
A person approves each kind of change once; after that it runs under that rule.
To see it on your own numbers, book a 30-minute walkthrough.
Sources
SourceDay, What Is Lead Time in Supply Chain? Definition, Formula, Examples (a software vendor): https://sourceday.com/blog/lead-time/ (read 12 November 2026)
Lean Enterprise Institute, Takt Time: https://www.lean.org/lexicon-terms/takt-time/ (read 12 November 2026)
Each term page lists its own sources, all read on 12 November 2026.