How an andon system works, step by step
“Andon” is Japanese for a paper lantern. Toyota UK says Toyota has used the system since 1950, and that it applies jidoka, the idea of highlighting a problem the moment it happens so it can be fixed and not repeated [1][2]. The steps:
Signal. An operator pulls a cord or presses a button, or a machine sensor trips the light by itself [3].
Locate. A board lights the number of the station, so the team leader knows where to go [2][3].
Respond. The team leader goes there.
Fix or stop. If the problem is solved within the station’s process time, work continues. If not, the line stops, at a fixed position so other stations are not disturbed [2][3].
Log. The call is recorded so the plant can study which stations stop most [1][4].
How a modern andon escalates
A light on a stack is a signal, not a response. A modern andon adds a named responder and a clock. Vorne advises setting the longest time a line may stay down while a fix is sought, so supervisors and operators are not left exposed [5]. An example rule, ours; set yours to your own process times:
If unanswered after | Who is told |
|---|---|
0 minutes (the call) | Team leader at the station |
2 minutes | Shift supervisor |
10 minutes | Maintenance manager and plant manager |
The line stop is a separate rule: the line stops when the problem is not fixed within the station’s process time.
Andon response time: the number to track
Andon response time is the minutes from the call to the responder arriving at the station. Take five calls in a shift: 1, 2, 2, 4 and 11 minutes. The average is (1 + 2 + 2 + 4 + 11) ÷ 5 = 4 minutes, but the median is 2 and the worst is 11. Report the median and the worst, because the average hides the 11. This is our example and our suggested metric; the sources read give no response-time target.
What to do this week. Log the time of the call and the time someone arrives for every stop over 5 shifts; paper is fine. Report the median and the worst. For the slow ones, find out whether nobody noticed or nobody was free. Then set the clock above and write it on the board.
Andon lights and what the colors mean
Color | Meaning | What happens |
|---|---|---|
Green | Running normally | Nothing |
Yellow | Non-critical problem | Fix soon so it does not stop the line |
Red | Critical problem, line stopped | Immediate response |
Blue | Planned stop (break, maintenance) | No fault |
This is the common convention, from a vendor of andon equipment [5]. Colors vary by plant and region, so write yours down and use them everywhere.
The andon cord
At Toyota’s UK plant the cord runs the length of the line; pulling it lights the station number, and pulling it again restarts the line [2]. Pulling does not always stop the line: it pauses only if the problem is not solved within the station’s process time [2]. A button can replace the cord, and the cord is only one way to start an andon [4].
How plants and distributors use andon
A plant puts tower lights on machines and a board in the area, and ties the board to the shop floor system; see production monitoring and downtime reason codes. A distributor can put a tower light above each pack station so a supervisor sees a stalled station from across the floor [6].
Common andon mistakes
Blaming the person who pulls. If a genuine call is punished, operators stop calling. Thank the caller, then fix.
No response standard. A light nobody answers within minutes is wallpaper. Set the clock above.
Too many colors or meanings. Keep four, written down.
A call that does not say where. The signal must name the station or machine [3].
No review. Without a daily look at the log, the same stop repeats; walk the station on a gemba walk.
Escalating the call and logging it
Morsa does the part a light cannot:
When a machine reports a stop, it posts to the team leader in Teams with the station and the customer orders at risk from your ERP.
If nobody acknowledges inside the minutes in the rule above, it tells the next person up. A person approves the escalation rule once; after that it runs under that rule.
It records every call and its reason, and puts response time per shift in the morning brief.
To see it on your lines, book a 30-minute walkthrough.
Related terms
Operations glossary: every term.
Production monitoring: the live machine data that can raise an andon call by itself.
Gemba walk: going to the station where the calls come from.
Takt time: the pace the line must hold; a stop costs units against it.
Sources
Toyota UK, Andon, Toyota Production System guide: https://mag.toyota.co.uk/andon-toyota-production-system/ (read 12 November 2026)
Toyota UK, TMUK’s 25 Objects, 19: Andon Cord: https://mag.toyota.co.uk/toyota-manufacturing-25-objects-andon-cord (read 12 November 2026)
Lean Enterprise Institute, Andon: https://www.lean.org/lexicon-terms/andon/ (read 12 November 2026)
Wikipedia, Andon (manufacturing): https://en.wikipedia.org/wiki/Andon_(manufacturing) (read 12 November 2026)
Vorne, Andon (a vendor of andon equipment): https://vorne.com/learn/key-concepts/andon (read 12 November 2026)
FLData, Using Andon Systems for Continuous Improvement: https://www.fldata.com/blog/andon-systems/ (read 12 November 2026)