Make to order definition, make to stock definition and the table
Make to order (also called build to order) is a production approach where products are not built until a confirmed order is received; the product is often customized to the buyer [1]. Make to stock builds ahead of any specific buyer, with volume driven by historical demand, and holds the result as finished goods [1][2].
Make to stock | Make to order | |
|---|---|---|
What triggers production | A forecast [2] | A customer order [1] |
Delivery time | Short, it ships from stock [2] | Longer, it includes the build [2] |
Finished inventory | High, with the risk of wrong or unsold stock | Little or none [2] |
The cost of each: MTS ties up cash and can leave you with products that do not sell; MTO leaves capacity idle when orders dip, and customers who will not wait buy elsewhere [1][2].
Assemble to order and engineer to order
Two points lie between. Assemble to order (ATO) stocks the basic parts, then assembles them quickly when an order arrives [1]. Engineer to order (ETO) starts the design only after the order, as in construction and plant building [1]. Many plants run a hybrid: build to a forecast up to a point (the decoupling point) and to order after it [2]. The nearer the point sits to raw materials, the closer you are to make to order [2].
How to decide per product
Two questions per product: how long will the customer wait, and how steady is demand?
Customer will wait | Demand | Choose |
|---|---|---|
Longer than your build time | Any | Make to order |
Shorter than your build time | Steady | Make to stock |
Shorter than your build time | Erratic | Assemble to order, stocking parts |
Measure steadiness as the sample standard deviation of weekly demand ÷ its average (Excel’s STDEV.S). Example figures are ours: a fitting sells 98, 102, 100, 95 and 105 a week, average 100, standard deviation 3.8, so 3.8%. Custom enclosures sell 0, 40, 0, 120 and 10, average 34, standard deviation 50.8, so 149%. Our rule of thumb: under about 25% is steady, over about 50% is erratic, and in between look at the product’s margin.
The fitting: steady, customers want it next day and the build takes 3 days. Make to stock. Two weeks of cover is 200 units; at $8 each (our assumption) that is $1,600 of stock, and at 20% a year to hold it (the assumption on our MOQ page) it costs $320 a year. Stock pays if the margin on the sales that next-day delivery wins is more than that.
The enclosures: different every time, customers accept 4 weeks against a 2-week build. Make to order.
A configurable pump: a 5-day promise, stocked parts and a 1-day final build. Assemble to order.
If customers want it faster than you can build it, you stock it or you lose the order.
How plants and distributors use make to order and make to stock
A plant usually runs both. It stocks the few products that sell steadily and builds the rest to order; ABC analysis shows which are which. Aircraft, cars with many options, computer servers and custom furniture are made to order; consumer electronics, toys and household goods are made to stock [1][3]. A distributor is the same: it stocks the A items and special-orders the rest, quoting the supplier’s lead time plus its own. Check the plant can hold the date with capacity planning before quoting.
Common make to order and make to stock mistakes
Stocking erratic items. Building standard stock to a bad forecast piles up unsold goods [2].
Making commodity goods to order. Customers who expect off-the-shelf delivery leave [2].
One policy for every product. Standard and custom lines need different rules [2].
Quoting a date without checking capacity. An MTO date is only as good as the load on the work centers.
Never revisiting. Demand shifts; recheck the table above at least twice a year. A monthly flag is the faster check.
Choosing stock or order for each product
Morsa makes the choice visible, product by product:
It reads 12 months of orders per SKU from your ERP, works out how steady demand is, and compares the lead time customers asked for with your production lead time.
It proposes which products to stock, which to build to order and which to assemble to order, with the arithmetic shown.
The planner approves, Morsa updates the planning setting in the ERP, and each month it flags products whose demand has moved enough to change the answer.
To see it on your products, book a 30-minute walkthrough.
Related terms
Operations glossary: every term.
Lead time: the time customers accept against the time you need.
Capacity planning: whether the plant can build to order on time.
ABC analysis: which products earn finished stock.
Sources
Wikipedia, Build to order (make to order): https://en.wikipedia.org/wiki/Build_to_order (read 12 November 2026)
Fabrico, Make-to-Stock vs Make-to-Order (a software vendor): https://www.fabrico.io/blog/make-to-stock-vs-make-to-order/ (read 12 November 2026)
inFlow, Make to Order vs Make to Stock (a software vendor): https://www.inflowinventory.com/blog/make-to-order-vs-make-to-stock/ (read 12 November 2026)
Megaventory, Make to Order vs Make to Stock: A Comparative Study: https://blog.megaventory.com/2023/05/make-to-order-vs-make-to-stock-a-comparative-study/ (read 12 November 2026)