Make to order vs make to stock: definitions, table and how to choose

Make to stock (MTS) builds finished goods to a forecast and ships from inventory; make to order (MTO) starts building only after a customer order arrives. MTS delivers fast but risks holding the wrong stock; MTO holds almost none, but the customer waits for production.

5 min

Morsa publishes this guide. Morsa is software with an AI agent that works in your ERP, email and Teams; it proposes stock policy, and a person approves what goes out.

Make to order definition, make to stock definition and the table

Make to order (also called build to order) is a production approach where products are not built until a confirmed order is received; the product is often customized to the buyer [1]. Make to stock builds ahead of any specific buyer, with volume driven by historical demand, and holds the result as finished goods [1][2].


Make to stock

Make to order

What triggers production

A forecast [2]

A customer order [1]

Delivery time

Short, it ships from stock [2]

Longer, it includes the build [2]

Finished inventory

High, with the risk of wrong or unsold stock

Little or none [2]

The cost of each: MTS ties up cash and can leave you with products that do not sell; MTO leaves capacity idle when orders dip, and customers who will not wait buy elsewhere [1][2].

Assemble to order and engineer to order

Two points lie between. Assemble to order (ATO) stocks the basic parts, then assembles them quickly when an order arrives [1]. Engineer to order (ETO) starts the design only after the order, as in construction and plant building [1]. Many plants run a hybrid: build to a forecast up to a point (the decoupling point) and to order after it [2]. The nearer the point sits to raw materials, the closer you are to make to order [2].

How to decide per product

Two questions per product: how long will the customer wait, and how steady is demand?

Customer will wait

Demand

Choose

Longer than your build time

Any

Make to order

Shorter than your build time

Steady

Make to stock

Shorter than your build time

Erratic

Assemble to order, stocking parts

Measure steadiness as the sample standard deviation of weekly demand ÷ its average (Excel’s STDEV.S). Example figures are ours: a fitting sells 98, 102, 100, 95 and 105 a week, average 100, standard deviation 3.8, so 3.8%. Custom enclosures sell 0, 40, 0, 120 and 10, average 34, standard deviation 50.8, so 149%. Our rule of thumb: under about 25% is steady, over about 50% is erratic, and in between look at the product’s margin.

  • The fitting: steady, customers want it next day and the build takes 3 days. Make to stock. Two weeks of cover is 200 units; at $8 each (our assumption) that is $1,600 of stock, and at 20% a year to hold it (the assumption on our MOQ page) it costs $320 a year. Stock pays if the margin on the sales that next-day delivery wins is more than that.

  • The enclosures: different every time, customers accept 4 weeks against a 2-week build. Make to order.

  • A configurable pump: a 5-day promise, stocked parts and a 1-day final build. Assemble to order.

If customers want it faster than you can build it, you stock it or you lose the order.

How plants and distributors use make to order and make to stock

A plant usually runs both. It stocks the few products that sell steadily and builds the rest to order; ABC analysis shows which are which. Aircraft, cars with many options, computer servers and custom furniture are made to order; consumer electronics, toys and household goods are made to stock [1][3]. A distributor is the same: it stocks the A items and special-orders the rest, quoting the supplier’s lead time plus its own. Check the plant can hold the date with capacity planning before quoting.

Common make to order and make to stock mistakes

  1. Stocking erratic items. Building standard stock to a bad forecast piles up unsold goods [2].

  2. Making commodity goods to order. Customers who expect off-the-shelf delivery leave [2].

  3. One policy for every product. Standard and custom lines need different rules [2].

  4. Quoting a date without checking capacity. An MTO date is only as good as the load on the work centers.

  5. Never revisiting. Demand shifts; recheck the table above at least twice a year. A monthly flag is the faster check.

Choosing stock or order for each product

Morsa makes the choice visible, product by product:

  1. It reads 12 months of orders per SKU from your ERP, works out how steady demand is, and compares the lead time customers asked for with your production lead time.

  2. It proposes which products to stock, which to build to order and which to assemble to order, with the arithmetic shown.

  3. The planner approves, Morsa updates the planning setting in the ERP, and each month it flags products whose demand has moved enough to change the answer.

To see it on your products, book a 30-minute walkthrough.

Related terms

Sources

  1. Wikipedia, Build to order (make to order): https://en.wikipedia.org/wiki/Build_to_order (read 12 November 2026)

  2. Fabrico, Make-to-Stock vs Make-to-Order (a software vendor): https://www.fabrico.io/blog/make-to-stock-vs-make-to-order/ (read 12 November 2026)

  3. inFlow, Make to Order vs Make to Stock (a software vendor): https://www.inflowinventory.com/blog/make-to-order-vs-make-to-stock/ (read 12 November 2026)

  4. Megaventory, Make to Order vs Make to Stock: A Comparative Study: https://blog.megaventory.com/2023/05/make-to-order-vs-make-to-stock-a-comparative-study/ (read 12 November 2026)

Keep reading

Keep reading

Keep reading

Related pages

Glossary

Glossary

Glossary

Operations glossary: 15 terms for plants and distributors

The operations glossary defines 15 terms that plant managers, buyers and warehouse leads use every week, grouped by planning, purchasing and suppliers, shop floor and warehouse. Each term has a one-line definition here and its own page with a formula or a worked example.

Read the page

›

Glossary

Glossary

Glossary

Lead time: meaning, formula and how it sets your reorder point

Lead time is the time from placing an order to receiving it: lead time = receipt date minus order date. A purchase order placed on October 1 and received on October 31 has a 30-day lead time. The same word covers a supplier's lead time, your own production lead time, and what your customer waits.

Read the page

›

Glossary

Glossary

Glossary

Capacity planning in manufacturing: formula, example and tools

Capacity planning in manufacturing checks whether a plant can make what the plan asks, by comparing the hours demand needs with the hours each work center can deliver. Rated capacity = available hours × utilization × efficiency: 2 machines, 8 hours, 5 days is 80 hours, and at 90% utilization and 95% efficiency that is 68.4 standard hours a week.

Read the page

›

FAQs

FAQs

FAQs

Questions people ask

Questions people ask

Still have a question? A founder will answer.

01

What is make to order?

A product is built only after the customer orders it.

02

What is make to stock?

A product is built ahead and sold from inventory.

03

What is make to order manufacturing?

A plant that starts production on a confirmed order. Typical products are customized or expensive to hold [1][3].

04

What is make to order manufacturing software?

An ERP or planning tool that turns a sales order into a production order and schedules it against capacity. See production planning software and job shop ERP.

05

Is make to stock cheaper than make to order?

Not by default. MTS can cost less per unit through batches and scale [4] but carries stock risk [2]; MTO saves stock but costs delivery time.

06

Can a company use both?

Yes, and most do, one policy per product or a hybrid at the decoupling point [1][2].

Where Morsa fits

Where Morsa fits

Where Morsa fits

Find out where AI could make your plant more money.

Answer a few questions about your plant. We come back with a free Manufacturing AI Profitability Plan, and we tell you honestly if we are not the right fit.

Machines, people, and vendors, finally in one. We start with yours.

For queries, feedback or suggestions

© 2026 Morsa. All Rights Reserved. A Product by Lunar.

Machines, people, and vendors, finally in one. We start with yours.

For queries, feedback or suggestions

© 2026 Morsa. All Rights Reserved. A Product by Lunar.

Machines, people, and vendors, finally in one. We start with yours.

For queries, feedback or suggestions

© 2026 Morsa. All Rights Reserved. A Product by Lunar.