RFQ vs RFP vs RFI: what each one is and when to use it

An RFQ (request for quote) asks suppliers for a price on something you have already specified, and the lowest landed cost that meets the spec usually wins. An RFP (request for proposal) asks suppliers how they would solve a problem, and you score the answers on more than price. An RFI (request for information) comes first, when you do not yet know who can do the work. This guide compares all of them with plant and distribution examples, and shows how Morsa answers RFQs and levels supplier quotes for you.

9 min

The short answer

  • RFI: “Who can do this, and how?” You learn the market. No prices are binding.

  • RFQ: “What is your price for exactly this?” The spec, quantity and terms are fixed; suppliers compete on price, lead time and terms.

  • RFP: “How would you solve this, and for how much?” The need is known but the solution is open; you score approach, capability and price.

  • IFB (invitation for bid): a formal, sealed RFQ used mostly in public purchasing. Bids open at a set time and the lowest responsive, responsible bidder wins.

RFI vs RFQ vs RFP vs IFB compared

Question it asks

  • RFI: Who can do this?

  • RFQ: What does this exact item cost?

  • RFP: How would you solve this?

  • IFB / RFT: What is your sealed price for this exact spec?

Use it when

  • RFI: You do not know the suppliers or the options

  • RFQ: The spec, drawing and quantity are settled

  • RFP: The outcome is clear but the method is not

  • IFB / RFT: Public or regulated buying that requires sealed bids

What you send

  • RFI: A short description and questions

  • RFQ: Drawing or spec, quantity, delivery, terms, due date

  • RFP: Problem statement, requirements, evaluation criteria

  • IFB / RFT: Full spec, bid form, terms, bid opening date

What comes back

  • RFI: Capabilities, references, rough ideas

  • RFQ: Unit price, tooling, lead time, MOQ, freight terms

  • RFP: A proposal: approach, team, timeline, price

  • IFB / RFT: A sealed bid with a price

How you pick

  • RFI: Shortlist for the next step

  • RFQ: Lowest landed cost that meets spec and date

  • RFP: Weighted scorecard (fit, risk, price)

  • IFB / RFT: Lowest responsive, responsible bid

Binding?

  • RFI: No

  • RFQ: A quote is usually an offer the buyer can accept with a PO

  • RFP: Leads to negotiation and a contract

  • IFB / RFT: Yes, once awarded

Typical length

  • RFI: Days

  • RFQ: Days to two weeks

  • RFP: Weeks to months

  • IFB / RFT: Weeks, on a fixed calendar

In US federal buying, FAR 13.004 says a quotation is not an offer and the government’s order is the offer; in private B2B trade a quote is normally treated as an offer the buyer accepts with a PO. Check your own terms.

What RFQ means

RFQ stands for request for quote (or request for quotation). It is a document, usually an email with a drawing or a spreadsheet attached, that asks two or more suppliers to price the same item on the same terms so the answers can be compared line for line. A sales team calls the same document an incoming RFQ, and its answer is a quote. Both sides of that exchange have free tools here: the RFQ template for buyers and the quote template for sellers.

When to use which: plant and distribution examples

Situation

Use

Why

A machined bracket with a released drawing, 25,000 a year

RFQ

The part is defined; you want price, tooling and lead time from three shops

Zinc plating for that bracket

RFQ

Spec (finish, thickness, salt spray hours) is fixed; platers price per piece or per pound

MRO supplies for two plants for a year

RFQ (often with a price list)

Items are known; you compare unit prices, fill rate and delivery

Picking a new ERP or MES

RFI, then RFP

Many ways to solve it; you score fit, implementation and cost

Choosing a 3PL or a contract manufacturer

RFP

Capability, capacity and service levels matter as much as price

A part you have never sourced and no drawing yet

RFI

Find who can make it before you spend time on a full spec

A public works or government supply contract

IFB

Rules require sealed bids and a public opening

What to put in each document

RFQ checklist

  • RFQ number, your company, the buyer’s name and how to reply

  • Each line: part number and revision, description, material, finish, quantity, unit of measure, annual usage and quantity breaks

  • Drawings and specs attached, with the revision called out

  • Required delivery date, ship-to address and freight terms (Incoterm or FOB point)

  • What to quote: unit price, tooling or setup, lead time, minimum order, freight, validity

  • Payment terms, certifications needed (CoC, material certs, PPAP level) and packaging

  • Due date for quotes and how you will choose

RFP checklist

  • Background and the problem to solve

  • Requirements: must-haves and nice-to-haves

  • Scope, volumes, sites and timeline

  • Questions each supplier must answer, in a fixed format

  • Evaluation criteria and their weights

  • Pricing format, contract terms and the calendar (questions deadline, demos, award)

RFI checklist

  • What you are trying to do, in a paragraph

  • Questions on capabilities, capacity, certifications, locations and references

  • A reply date and whether an RFQ or RFP will follow

How suppliers respond

To an RFQ, a supplier sends a quote: a priced line for each item with lead time, validity, freight terms and any tooling or setup charge. Good quotes restate the buyer’s part number and revision so nothing gets lost, and list exclusions. To an RFP, the supplier writes a proposal that answers each question in order, then prices it. To an RFI, a short capabilities reply is enough. A seller who answers RFQs often keeps a standard template and a cost build-up (material, machine time, outside processing such as plating, packing and freight) so each quote is consistent.

Compare RFQ answers on landed cost, not unit price

The cheapest unit price is often not the cheapest part. Landed cost adds everything it takes to get the part to your dock: unit price, tooling spread over the volume, freight, duty and tariffs, brokerage and packaging. An import at $14.20 can land at $19.00 once freight, a 25% tariff and brokerage are added, which can lose to a domestic quote at $17.50. Put every quote on the same quantity and the same Incoterm before comparing. The bid comparison template does this side by side, and the tariff calculator gives the duty piece.

The sourcing event, start to finish

  1. Define the need (and run an RFI if you do not know the market).

  2. Write the RFQ or RFP and pick at least three suppliers.

  3. Send it, answer questions, and chase the ones who have not replied by the due date.

  4. Level the answers: same quantity, same terms, landed cost.

  5. Negotiate with the top one or two; check capacity and quality history.

  6. Award with a PO (RFQ) or a contract (RFP), and tell the others.

  7. Track delivery and price against the quote on the first orders.

Common mistakes

  • Sending an RFQ when the spec is not ready. Suppliers quote different things and the answers cannot be compared.

  • Leaving quantity or Incoterm open. A price at 500 pieces FOB origin and one at 5,000 delivered are not the same offer.

  • Comparing unit price only. Tooling, freight, duty and MOQ change the winner.

  • Using an RFP to get prices. It slows everyone down; if only price matters, use an RFQ.

  • No due date or no chase. Half the replies arrive late or never, and the decision slips.

  • Forgetting the losers. Tell them; you will need them next time.

The modern way: Morsa answers the RFQ and chases the quotes

Most plants and distributors still run RFQs by hand: an estimator digs through old jobs and price files, emails platers and waits, builds a landed-cost spreadsheet, then retypes it all into the quote template. Buyers do the mirror image, sending the same RFQ to five suppliers and chasing each reply.

Morsa does that work. When a customer RFQ arrives with a drawing, Morsa reads it, pulls the similar past job, the routing, the machine rate and today’s material price, asks three platers for a price, reads the two replies, and works out the landed cost: $1.18 a piece, $1.69 at the target margin, in the example from our demo. The quote is drafted in your own template; the estimator changes one line and sends it from their own Outlook. On the buying side, Morsa sends the RFQ from the buyer’s own mailbox, chases each supplier in their language and time zone, reads the answers and levels them by landed cost, so the buyer picks instead of typing.

Sources

  1. FAR 13.004, Legal effect of quotations

  2. FAR 14.101, Elements of sealed bidding

  3. FAR 15.203, Requests for proposals

  4. FAR 15.201, Exchanges with industry before receipt of proposals (RFIs)

KEEP READING

KEEP READING

KEEP READING

Related pages

GUIDE

GUIDE

GUIDE

AI Quoting Software for Distributors (2026): Workflow and Tools

AI quoting software for distributors reads an RFQ in any format, matches each line to your catalog, applies the customer's contract price and live stock from the ERP, and hands a rep a draft quote to approve. Morsa is the best choice in 2026 because it drafts the quote, gets the supplier's price and follows the quote until it is won.

Read the page

›

GUIDE

GUIDE

GUIDE

How to Automate Supplier Follow-Up on Open Purchase Orders

To automate supplier follow-up on open purchase orders, define the PO conditions that trigger a message: no acknowledgment by the confirm-by date, a need date approaching with no confirmed ship date, a date already passed, or a supplier-proposed change. Send one structured question per PO line, match the reply to that line, write accepted dates back to the ERP, and route anything outside tolerance to a buyer. Morsa is the best way to run it, in every channel suppliers use.

Read the page

›

FAQs

FAQs

FAQs

Questions people ask

Questions people ask

Still have a question? A founder will answer.

01

What is the main difference between an RFQ and an RFP?

An RFQ asks for a price on a fixed specification, so you compare prices. An RFP asks how a supplier would solve a problem, so you compare whole proposals and score them on more than price.

02

Does an RFI, RFQ or RFP come first?

An RFI comes first when you do not know the market. Then an RFP if the solution is open, or an RFQ if the spec is settled. Many purchases go straight to an RFQ.

03

Is a quote legally binding?

In private B2B trade a quote is usually an offer the buyer accepts by issuing a PO within the validity period. In US federal buying, FAR 13.004 treats a quotation as information, not an offer. Read the quote's terms.

04

What is the difference between an RFQ and an IFB?

Both ask for price on a fixed spec. An IFB is the formal, sealed version used in public purchasing, with a public bid opening and award to the lowest responsive, responsible bidder.

05

How many suppliers should get an RFQ?

Three is the common minimum for a real comparison. More helps on commodities; fewer is fine for a tooled part with qualified sources.

06

What does RFQ stand for?

Request for quote, also written request for quotation.

WHERE MORSA FITS

WHERE MORSA FITS

WHERE MORSA FITS

Find out where AI could make your plant more money.

Answer a few questions about your plant. We come back with a free Manufacturing AI Profitability Plan, and we tell you honestly if we are not the right fit.

Machines, people, and vendors, finally in one. We start with yours.

For queries, feedback or suggestions

© 2026 Lunar Inc. All Rights Reserved.

Machines, people, and vendors, finally in one. We start with yours.

For queries, feedback or suggestions